Sierra Wireless Technical Services

Engineering support, device lifecycle management, and carrier certification services that accelerate your IoT deployment timeline.

Service Capabilities

Structured technical services designed to reduce time-to-market and minimize integration risk.

Pre-Deployment Services
Architecture Review Connectivity protocol selection, coverage analysis, and network topology design for your specific deployment geography and use case.
Hardware Evaluation Module evaluation kits with reference schematics, layout guidelines, and RF antenna matching support.
Carrier Certification End-to-end regulatory and carrier approval management across 450+ networks globally.
Custom Firmware Application-specific firmware development for embedded Linux and RTOS platforms with AT command customization.
Post-Deployment Services
OTA Management Remote firmware updates, configuration pushes, and delta patching for field-deployed devices via AirVantage.
Fleet Monitoring Real-time device health dashboards, connectivity status tracking, and anomaly detection alerts.
Technical Support Tiered support plans with guaranteed response SLAs. Level 3 escalation to RF and protocol engineers.
Lifecycle Planning Product longevity roadmaps, end-of-life notifications, and migration planning for next-generation modules.

Our Engagement Methodology

A structured, repeatable process that takes your IoT project from concept validation through mass deployment with minimal technical risk.

1

Requirements Analysis

Define connectivity specifications, environmental constraints, power budget, data throughput, and latency requirements.

2

Proof of Concept

Deliver evaluation hardware, development environment, and reference firmware for rapid prototyping and field validation.

3

Design Validation

RF performance verification, EMC pre-compliance testing, antenna matching, and thermal characterization on your carrier board.

4

Certification & Production

Manage regulatory filings, carrier lab testing, and production ramp-up with quality gate checkpoints at each milestone.

5

Ongoing Management

Deploy fleet management tools, establish OTA update pipelines, and configure monitoring dashboards for operational excellence.

Service Scope Boundaries

Transparent expectations help ensure successful project outcomes.

Carrier Certification Timeline

Carrier lab testing and approval timelines are controlled by each carrier. Typical certification cycles range from 8-16 weeks depending on the carrier and module complexity. Expedited timelines are not available for all carriers. Our 60% faster claim is based on pre-certification documentation packages — not guaranteed carrier processing time.

Custom Firmware Limitations

Custom firmware development is available for orders exceeding 5,000 units annually. Firmware modifications are limited to the application layer — baseband firmware and radio stack are not customer-modifiable due to regulatory certification constraints. Custom builds require 6-10 weeks lead time and a separate validation cycle.

AirVantage Platform Constraints

The AirVantage cloud platform supports up to 10 million devices per tenant. OTA update campaigns are rate-limited to 50,000 concurrent sessions to prevent network congestion. Customers requiring on-premises deployment of the management platform should contact our enterprise sales team — cloud-only is the standard offering.

Discuss Your Project Requirements

Our engineers are ready to review your connectivity specifications and recommend the optimal module, gateway, and management platform combination.

Schedule Technical Review